Drawings and permits

Building permit drawings in Amman, Jordan: preparing the permit file in coordination with a licensed engineering office

No legal construction starts in Jordan without a building permit, and the permit file has defined requirements at Greater Amman Municipality and the local municipalities. I prepare building permit drawings for villas, apartment buildings and commercial buildings to those requirements, and the application is submitted and its comments followed up in coordination with a licensed engineering office until the permit is issued.

Ground floor plan with the planted internal courtyard and parking ramps

An architect specialised in building permit drawings in Amman and across Jordan

Who this service is for

  • Owners of a plot in Amman or any governorate who want to start building a villa or apartment building
  • Investors building housing or a commercial building who want a permit file that passes without delay
  • Owners who want to add a floor or room or change openings in an existing house and need an addition and modification permit
  • Owners whose application stalled on municipal comments and who want the drawings corrected

What the service includes

  • Review of the site plan, residential zoning, building ratio and setbacks
  • Architectural permit drawings: site plan, floor plans, elevations and sections
  • Area schedule in the format the municipality requires
  • Coordination with the structural and MEP engineers to complete the rest of the file
  • Submission through a licensed engineering office with Jordan Engineers Association stamps
  • Follow up on municipal comments and drawing revisions until the permit is issued
  • Addition and modification permit drawings for existing buildings

What a building permit file contains at Greater Amman Municipality and local municipalities

A building permit file has two parts: the ownership and site documents, and the engineering drawings. The first part includes the title deed, the zoning site plan (the sheet that shows the residential zone and surrounding streets) and the land survey. The second part is the architectural, structural, electrical and mechanical drawings, and municipalities sometimes add requirements such as a soil report for larger buildings.

My part of this file is the architectural drawings: a site plan with setbacks, floor plans for every level, elevations, sections and an area schedule proving the building is within the allowed building ratio. Greater Amman Municipality has a set format for presenting and numbering these drawings, and other municipalities have similar ones. I prepare the drawings in the required format from the start, because any difference in format means resubmitting.

The role of the licensed engineering office and the Jordan Engineers Association

In Jordan, a municipality does not accept a permit file from an individual. The file is submitted through a licensed engineering office (an office registered with the Jordan Engineers Association and classified for the building type and size), and the drawings are stamped by the association before submission. This arrangement protects the owner because it places responsibility for the drawings on a licensed party.

So I work in coordination with a licensed engineering office: I prepare the architectural drawings, coordinate with the structural and MEP engineers inside or outside that office, and the office submits the file in its name and follows the application. I remain the reference for everything related to the design, and I answer municipal comments with quick drawing revisions so the application does not stall. If you already work with a licensed office, I work with it directly.

Common comments that delay a building permit in Amman and how I avoid them

Most permit delays come from comments that could have been avoided before submission. The most frequent: exceeding the front or side setbacks even slightly, exceeding the allowed building ratio once projections and balconies are counted, openings on the neighbor's boundary the zone does not allow, missing the required parking spaces, a roof floor larger than allowed, or a mismatch between floor plans and elevations in the same file.

I avoid these by checking the zoning first, calculating areas the way the municipality calculates them rather than the way a contractor does, and reviewing the complete file before it goes for stamping. The final reference for every requirement is the municipality, and when a plot is unusual (steep slope, two streets, mixed zoning) I ask the relevant department before drawing, not after.

Addition and modification permits for existing houses, and how long a permit takes

Adding a floor, a room on the roof, changing facade openings or converting a house into apartments all need an addition and modification permit rather than a new one. Its file needs as-built drawings (the house drawn exactly as it stands), drawings of the proposed change, and a structural engineer's opinion that the structure can carry the addition. If the house was built with an earlier violation, it surfaces at submission and needs to be settled before the addition is approved.

Permit timing differs between Greater Amman Municipality and local municipalities and from plot to plot. It is usually a few weeks from submitting a complete file, and longer when comments come back or the site needs extra approvals. Permit fees are paid to the municipality and the association according to their schedules and are not part of my fee. My fee is based on the built area and project type, and I send a written quote after reviewing the title deed and site plan.

Frequently asked questions

How long does a building permit take in Amman?

Usually a few weeks from submitting a complete file, and longer when comments come back or the site needs extra approvals. I prepare the file complete from the start to reduce comments.

Do you issue the building permit yourself?

The application is submitted through a licensed engineering office and stamped by the Jordan Engineers Association. I prepare the architectural drawings, coordinate with the licensed office and follow up comments until the permit is issued.

What is the difference between permit drawings and construction drawings?

Permit drawings prove the building is within what the municipality allows. Construction drawings are far more detailed and are what the contractor actually builds from.

Do I need a permit to add a floor or a room to my house?

Yes. Any added area or change in openings needs an addition and modification permit, with as-built drawings and a structural engineer's opinion.

What do I need to start the permit file?

The title deed, the zoning site plan and a clear idea of your needs. I review the zoning and send a written quote before starting the drawings.

Related services

Construction drawings

The preliminary design explains the idea and the permit drawings fix what is allowed, but the construction drawings are the set the contractor actually builds from: every dimension, every material, every detail. I prepare architectural construction drawings for villas, apartment buildings and commercial buildings in Amman and across Jordan, coordinated with the structural and MEP engineers and delivered as AutoCAD and PDF.

Read more

Villa design

A good villa starts with the plot itself: sun direction, views, setbacks and the building ratio your zone allows. I design the villa from the first sketch to the construction drawings, with studied facades and 3D visualization you can see before construction starts.

Read more

Residential building design

The number of apartments in a residential building is decided by the zoning, the building ratio and the setbacks of your plot, not by the drawing. I design apartment buildings from the zoning study to the construction drawings: unit layouts, parking, the stair and elevator core, and a facade that raises the value of the units when they are sold or rented.

Read more

Renovation and restructuring of existing buildings

An existing house holds value that should not be demolished: land in a good location, a sound structure and stone that keeps its worth. I restructure existing houses and apartment buildings in Amman by changing the plan, removing or adding walls, converting a house into apartments, adding a floor or roof level and renewing the facade, after a structural check and with a modification permit issued in coordination with a licensed engineering office.

Read more

Construction supervision

Good drawings do not guarantee a good building if nobody checks what the contractor executes. I follow the construction of villas and apartment buildings in Amman with site visits at every stage, checking the work against the drawings, approving materials, controlling changes and sending the owner a report of what was done, in coordination with a licensed engineering office as the regulations in Jordan require.